• Contrast
  • Text
  • Scaling
  • Content scaling 100%
  • Aa Font size 100%
  • Line height 100%
  • Letter spacing 100%

Khoozestan

Kerman

Boushehr

West Azerbaijan

Tehran

Hormozgan

Sistan and Baluchestan

Yazd

Ilam

Fars

Esfahan

Ardebil

Syria,Tishreen

Client

Plant/ Project Description

Consortium name

In- Progress       /Finished

South Zagros Oil and Gas Production Company

Engineering, Procurement, installation & commissioning for 3 Set Separators

-------

Newly awarded

Tehran Refinery

Supply of services for
turnaround of refinery

------

In progress (25%) *

Isfahan refinery

Design, procurement, construction of 18 loading arms & require facilities

------

In progress (4%) *

Siraf Investment company

Methanol Petrochemical complex

Petrotech Sun Co/

Azarab Industrial Group

In progress (5%) *

Iran Renewable Energy Organization (SUNA)

Sabalan Geothermal 5 MWe Power Plant

Petrotech Sun Co/

Nima consultant Co.

In progress (30%) *

National Iranian South Oilfields Co. (NISOC)

Ahwaz Central Desalting Plant

Petrotech Sun Co/

Fan azmayan  pooyandeh Co

In progress (87%)   *

Iranian Ship Building & Offshore Industries Complex Co (ISOICO)

Shipyard Big Crane
(3 Units), Bandar Abbas

----

Performance test    *

NIGC

(Fajr-e-Jam Gas Refinery)

85 MW Power Plant for

Fajr-e-Jam Gas Refinery

Petrotech Sun Co/

Oil Design & Construction co

Commissioning

*

Shareholders of Azarab Industrial company

PMC of Azarab Industrial Co. Group

----

Finished

Oromieh Petrochemical Complex                   

Sulfuric Acid Plant

(Cap. 150 TPD)

Petrotech Sun Co/

Ideh Sanat Modiriat

Finished  *

Oil & Energy Industries Development CO. (OEID) &

Iran Central oil Fields CO. (ICOFC)

Sarvestan – Saadatabad Oilfields Development Project

Petrotech Sun Co/

Oil Design & Construction co

Finished  *

PIDMCO

Management Contracting NF3( B.I.P.C)

----

Finished  *

National Iranian South Oilfields Co. (NISOC)

Parsi- Aghajari Desalting Plant

Petrotech Sun Co/

Oil Design & Construction co

Finished  *

Mapna

 

Tishreen power plant (Syria)

-----

Finished   *

MAPNA

Power Plant Yazd-Solar-Thermal Project (BOP)

----

Finished   *

Arvand Petrochemical Complex

Arvand PVC (Zone2) Plant

----

Finished  

Marun Petrochemical Complex

Mechanical Erection of EO/EG Plant, Bandar Imam

----

Finished

Mobin Petrochemical Complex

Utility Plant (Temporary), Assaluyeh

----

Finished

Sadid Industrial Group

Milad Tower Steel Structure, Tehran(MC)

----

Finished

Sadid Industrial Group

Managerial Services for Sedad Machine Mfg. Co., Tehran

----

Finished

Behineh Sazi (IFCO)

Conversion to Bi-Fuel (CNG-Petrol) of 254,000 Vehicles in Iran-Khodro, Tehran

----

Finished

PIDMCO- NPC

Flood Control at of Petrochemical Zone Area Assaloye, Iran)

----

Finished

Arak petrochemical complex

Olefin feed studying

----

Finished

MAPNA

Power Plant Project, Yazd

----

Finished

Mapna  boiler

 

HRSG  installation

----

Finished