Scope of Work
based on EPC and turn key contract and consisting of:
Engineering vBasic Engineering Endorsement vDetailed Engineering
Procurement vBulk material including civil materials, piping, valves vSteel structure vFixed equipment (vessels, storage tanks)
vPackaged process equipment (desalting unit,
dearation
unit, water treatment unit, IGF Unit)
vIndirect fired heaters vFlare unit vRotary equipment (Process pumps, utility pumps and
compressors)
vElectrical equipment and components vInstrumentation
Construction and commissioning v Mobilization and demobilization v Civil works v Pipe Line v Steel structure v Process and utility piping v Fixed equipment v Rotary equipment v Package units v Painting and insulation v Testing and NDT v Pre-commissioning v Commissioning and start up v Training v Final documents
|
||||||||